As a part of station improvement work at Mira Road station, the south-side staircase of the second southernmost Foot Over Bridge (FOB) at Platform No. 1 requires dismantling.
In view of the above, the said staircase will remain closed for commuters from the night of 25th July, 2025. Commuters can use the existing staircases, escalators, and elevators connected to the Middle FOB, North FOB, and South FOB at Platform No. 1 of Mira Road station.
Mumbai News: BMC Sanitation Workers Call Off Strike After Assurances On Job Security, Regularisation Of Contract StaffInconvenience to the passengers is highly regretted.
You may also like
Dhankhars pack up, set to vacate Vice-President Enclave; to be allotted bungalow in Lutyens' Delhi
I will just look to do better as much as I can, says Anshul Kmaboj on Test debut
Ali Fazal pens an emotional note for his core team that supported him through highs and lows
F1 driver market flickers into life as Cadillac narrow down shortlist for 2026
M&S handed mobile ad ban after featuring 'unhealthily thin' model